Channel Islands Showroom Now Open

SPL are please to annouce their Bereco high performance windows and doors are now on display in Norman Piette’s brand new Eco House in Guernsey.

The totally refurbished showroom is now open to both trade and public visitors and has been well received by many of the local architectural practice’s in Guernsey.

SPL have recently visited Guernsey to support Norman Piette in providing product presentations and architectural promotions.

Posted in Bi-folding Doors, Sash Windows, SPl News, Timber windows and doors | Tagged , , , | Leave a comment

Pingle Cottage Complete

SPL have now completed the bespoke oak floating staircase and contemporary Entrance door at Pingle Cottage.

Both the staircase and Entrance door were designed and manufacutred to meet all the criteria specified by the client.

Using both the oak and the glass together finished the project to the highest standard available.

Posted in SPl News | Tagged , , | Leave a comment

Work at the Castle begins

SPL have delivered the structural Oak beams for a Barn Conversion in the grounds of Eccleshall Castle. SPL secured the supply and installation contract from local building contractors “Staffordshire Building Company” at the end of 2011 and have now commenced on site.

The contract consists of the new external high performance hardwood windows, doors and arched glazed screens. The internal works includes the ledged and braced door sets.

Posted in SPl News, Timber windows and doors | Tagged , , | Leave a comment

New Extension in Conservation Area

SPL are please to have been awarded the contract to supply and install the Green Oak Framework, Oak staircase and new windows by local building contractors P H and C Easter.

The work will be completed in the Conservation area of Kings Bromley, all detailing will be replicated from the existing building and enhanced with the latest technology to improve the specification and performance of the windows and doors.

This is the first phase of the project and SPL will follow on with the second phase later in the year.

Posted in SPl News, Timber windows and doors | Tagged , , | Leave a comment

New Project for 2012

SPL are please to annonce that they have secured a contract to supply and install all the first and second fix joinery for local Developer “H and D Homes Ltd”.

“Having worked with H and D Homes Ltd previously in Stafford we are pleased to be awarded the contract for the second project” stated Shaun Holt Operations Director for SPL.

SPL pride themselves on their reputation for quality and customer service so repeat contracts are an important part of their business.

Posted in SPl News, Timber windows and doors | Tagged , | Leave a comment

Luxury Living

SPL’s experience with Green Oak was recently called upon.

SPL were awarded the contract to manufacture a green oak Sunroom for a Private Client in the Midlands.

SPL provided the complete package from design, structural calculations and manufacture. The client originally had a very simple hardwood conservatory and wanted to upgrade to a more substantial structure.

The oak was protected with Osmo Oil to provide a level of ultra-violet protection from the sun.

SPL also provided the high performance oak windows and bi-folding doors to complete the project.

Posted in Bi-folding Doors, SPl News, Timber windows and doors | Tagged , | Leave a comment

Gayton Completed

SPL have recently returned to a local project in Gayton following completion of the balcony and terrance area. SPL worked directly with the client and architect to provide the maximum clear opening with the slimmest sightlines available.

Performance was also a key factor as the rear elevation is very exposed.

Although SPL completed their works over 12 months ago the completion images were worth waiting for.

 

Posted in Bi-folding Doors, SPl News | Tagged , | Leave a comment

Eco-House in Guernsey

SPL have recently joined forces with Norman Piette in Guernsey to supply the high performance timber windows and doors for their new showroom.

An entire “Eco-House” will be built in the new purpose built showroom at Norman Piette’s in Guernsey.

SPL were chosen due to their experience in supplying and installing products into Guernsey over the past ten years.

“This is a really exciting opportunity to work with Norman Piette’s, this will  strengthen both their supply chain and increase our market share of products into the Channel Islands and we look forward to the future” said Operations Director Shaun Holt.

Posted in Bi-folding Doors, Sash Windows, SPl News, Timber windows and doors | Tagged , , | Leave a comment

Progress at Pingle Cottage

SPL are now near the completion of a large supply and installation project in Cannockwood.

 

SPL worked direct with the client and contractor to supply and install large aluminium bi-folding and french door sets from Germany, they also supplied and installed the timber and aluminium atrium glazed roof and the new hardwood windows and doors.

All products were chosen for their performance capabilities due to the location and extreme weather conditions.

 

SPL have also secured the contract to supply and install a bespoke oak and glass floating staircase. The staircase will have a main core of steelwork which will be completely hidden giving the effect that the treads are floating.

All the products were used to offer both a traditional and modern look through-out the scheme contrasting the old with the new.

 

Posted in Bi-folding Doors, SPl News, Timber windows and doors | Tagged , , , | Leave a comment

“Regents Park”

SPL’s experience in the industry was called upon by a local contractor for a project in one of the countries most prestigious postcodes “Cambridge Gate” in Regents Park, London.

SPL were required to produce a set of templates, full working drawings and manufacturing information for the factory following the completion of the survey for staircase. The staircase was to connect the basement with the 3rd floor where the swimming pool was located.

The staircase sub-straight was a metal core upon which “Teak” treads, risers and landings were fitted. The staircase was completed with a site applied oil finish, to protect the Teak from any water staining.

 

Posted in SPl News | Tagged | Leave a comment
Handmade bespoke joineryHandmade bespoke joinery

© simply pure logistics 2024